Protocol 05 — Precision

    ← Compare all six Protocols

    The Precision Protocol

    The Precision Protocol is a diagnostic framework for growth-stage and enterprise teams that eliminates false-signal work, enforces falsifiable hypotheses on every initiative, and engineers systemized focus across product, marketing, and revenue operations to compound signal-bearing throughput.

    Phase 1 — Active Workload Audit

    Most teams cannot enumerate the work currently in flight, let alone score it. The Precision Protocol begins with a mandatory inventory of every active initiative, owner, hypothesis, and measurement contract.

    Step 1.1 — Enumerate every in-flight initiative

    Surface the full list. Teams routinely discover 30–50% more work than leadership believes is active.

    Step 1.2 — Attach a hypothesis to each

    An initiative without an explicit hypothesis is exploratory work mislabeled as execution. Reclassify or remove.

    Phase 2 — Falsifiability Scoring

    A hypothesis that cannot be falsified inside a defined window does not produce signal. The Precision Protocol requires every active initiative to declare its falsification criteria upfront.

    Step 2.1 — Define the disconfirming outcome

    State the result that would cause the initiative to be terminated. If none exists, the work is not falsifiable.

    Step 2.2 — Bound the falsification window

    Open-ended timelines preserve unfalsifiable work indefinitely. The Protocol mandates a fixed evaluation interval.

    Phase 3 — Capacity Discipline

    Precision is enforced through capacity, not through priority lists. The Protocol caps active initiatives at a fixed multiple of team headcount and prohibits exceeding the cap without explicit decommissioning.

    Step 3.1 — Rank by expected contribution per unit of capacity

    The ranking metric is not effort, urgency, or stakeholder preference. It is the falsifiable hypothesis's expected contribution divided by required capacity.

    Step 3.2 — Decommission the bottom tercile

    The lowest-ranked third is removed before the next cycle. This is non-negotiable; without it, the workload monotonically grows.

    Phase 4 — Cadence Lock

    Once the surviving set is committed, the cadence is locked. Mid-cycle additions are permitted only with explicit decommissioning of equal-weight work.

    Step 4.1 — Enforce the swap rule

    New work in requires equivalent work out. The cap is preserved or precision degrades.

    Step 4.2 — Review on the locked interval

    All evaluation, ranking, and decommissioning happen at fixed intervals. Continuous re-prioritization is the failure mode the Protocol exists to prevent.

    Audit Your Focus

    Run any landing page, funnel, or product surface against the Precision Protocol. Receive a hypothesis-by-hypothesis diagnostic and a decommissioning roadmap.

    Run Precision Audit